This bathroom renovation guide starts from one principle: a good bathroom is judged five years after handover, not on the day the tiles are cleaned. In Jeddah's humidity, and with many older buildings, most bathroom problems we see come from the wrong order of works or skimping on waterproofing. Below is the correct sequence, from demolition to shower glass, with what drives the cost and a typical timeline.
Start with what's under the tiles
In homes older than 15–20 years we often find corroded galvanised pipes, poor drain falls and failed waterproofing. Tiling over these means breaking the new bathroom later. A proper survey should include:
- Checking for damp patches on the ceiling below and adjacent walls.
- Pressure-testing supply pipes.
- Verifying drain levels and inspection chamber positions.
- Inspecting the slab for spalling or rusting rebar.
If the whole house is ageing, our guide to old house renovation helps you decide whether the bathroom alone is enough.
Plan the layout: dimensions that make it comfortable
Draw the bathroom before choosing a single tile. Practical dimensions we work to:
- WC: centre line 40–45 cm from the nearest wall or fixture, with 60–70 cm clear in front.
- Basin: 80–85 cm high, with at least 70 cm standing space in front.
- Shower: minimum 90 × 90 cm; 100 × 120 cm or more where space allows.
- Door: opening outwards or sliding in small bathrooms so it never hits the WC or basin.
Wall-hung or floor-standing? Wall-hung WCs and basins make floors easy to clean and feel more spacious, but need a concealed steel frame and cistern fixed before tiling, serviced through the flush plate. Floor-standing pieces cost less and are easier to replace. We usually recommend wall-hung for master bathrooms and good floor-standing units for service bathrooms.
Waterproofing first, always
- Prepare: clean the slab, repair cracks and screed initial falls.
- Reinforce: tape or mesh at wall-floor junctions, drains and pipe penetrations.
- Apply: two crossed coats of flexible cementitious or liquid polymer membrane.
- Turn up: 20–30 cm on walls, and 180–200 cm or full height in the shower.
- Flood test: block the drain, flood the floor for 24–48 hours and check the ceiling below. No tiling until it passes.
Plumbing: concealed mixers and correct falls
Concealed mixers look clean and are easy to wipe down. Get them right by using a reputable brand whose cartridge can be serviced from the front, setting the body at the manufacturer's depth allowing for tile and adhesive, pressure-testing before closing up, and replacing old steel with quality PPR or PEX.
Falls and drains: the floor should fall about 1–2% to the drain. In the shower, a linear drain allows a single fall, large tiles and a level-access entry; a point drain is cheaper but needs four-way falls and smaller tiles. Every drain needs a proper trap, as sewer smells are a frequent complaint. See our MEP services for more.
Ventilation against Jeddah humidity
- A ducted extractor vented outside, sized for roughly 8–10 air changes per hour.
- Linked to the light switch with an overrun timer.
- A moisture-resistant gypsum board ceiling with anti-mould paint.
- An air path in, such as an undercut door or grille.
Tiles and finishes
| Material | Where | Strengths | Notes |
|---|---|---|---|
| Matt porcelain | Floors and walls | Tough, low absorption | Use slip-resistant floors (R10+) |
| Large-format porcelain | Walls | Fewer joints, premium look | Needs flat walls and skilled fixers |
| Natural marble | Vanities, feature walls | Unique luxury | Sensitive to acidic cleaners |
| Mosaic | Shower floors, niches | Follows falls, good grip | Use epoxy grout |
| Epoxy grout | Wet-area joints | Non-absorbent, stain-proof | Costlier, harder to apply |
Shower glass
- 8–10 mm tempered glass for frameless enclosures.
- 304 or 316 stainless fittings to resist salty air.
- Anti-limescale coating, helpful with hard water.
- Measure glass after tiling, never before.
Cost and timeline in Jeddah: what drives the price
Two bathrooms of the same size can differ a lot in cost depending on what is under the tiles and what goes on top. A relative comparison:
| Level | Relative cost | Typically includes |
|---|---|---|
| Basic | Lower | Waterproofing, new services, mid-range porcelain |
| Good | Medium | Concealed mixers, linear drain, glass shower, wall-hung basin |
| Premium | Higher | Large slabs or marble, premium sanitaryware, hidden lighting |
The main cost drivers are the state of existing pipes and drains, the sanitaryware and mixer brands (wall-hung pieces also need a concealed frame), tile size and material, and the shower glass specification. Ask for an itemised quotation that names the waterproofing system and number of coats, the flood test, pipe type and mixer body brand, and check for often-forgotten items such as debris removal, access panels and extractor ducting. If you need to save, never cut the waterproofing or plumbing; economise on accessories and choose good mid-range porcelain instead of marble. We offer a free site visit for an accurate quotation.
| Stage | Approx. duration |
|---|---|
| Demolition | 1–2 days |
| Services and pressure test | 2–4 days |
| Waterproofing and flood test | 3–4 days |
| Tiling and grouting | 4–7 days |
| Ceiling, paint, fit-off, glass | 3–6 days |
Common renovation mistakes
- Tiling before the flood test to save two days.
- Reverse or weak falls that leave water at the door.
- A water heater above the ceiling with no access hatch.
- Sockets too close to the shower or without earth-leakage protection.
- Standard cement grout in the shower, which stains and grows mould.
- A single ceiling light that leaves your face in shadow at the mirror.
Handover checklist
- Flood test passed and photographed.
- Visible falls: pour water and watch where it goes.
- No drain odours.
- Extractor works and vents outside.
- Wall-hung basin and WC are rigid.
- Anti-mould silicone around tray and glass.
How Alfa can help
At Alfa for Decor & Contracting we renovate bathrooms in the right engineering order: survey, services, waterproofing and testing, then finishes, with transparent pricing and a committed schedule. Explore our Kitchens & Bathrooms service or contact us for a free consultation and site visit.
FAQ
What determines bathroom renovation cost in Jeddah?
The biggest drivers are the condition of the existing pipes and drains, the size of the room, the tile type, and the level of sanitaryware, mixers and shower glass. A basic refresh costs least and a premium marble or large-slab bathroom the most. A site survey gives you an accurate, itemised quotation.
How long does a bathroom renovation take?
A full renovation usually takes two to four weeks, covering demolition, new plumbing, waterproofing with a flood test, tiling and fit-off. Delays in sanitaryware or made-to-measure shower glass can add a few days.
Can I tile over existing bathroom tiles?
It is possible in limited cases where old tiles are sound, but it prevents renewing the waterproofing or correcting floor falls and raises the floor level. In most older Jeddah bathrooms we recommend stripping back to the slab.
What is the best waterproofing for a bathroom?
Two coats of flexible cementitious or liquid polymer membrane, with reinforcing tape at corners and drains, turned up 20 to 30 cm on walls and to at least 180 cm inside the shower, followed by a 24 to 48 hour flood test.
How do I stop mould in a bathroom in Jeddah's humidity?
Install a ducted extractor fan sized for the room and vent it outside, ideally linked to the light with an overrun timer. Pair it with moisture-resistant gypsum board on the ceiling and anti-mould paint.